Get a Quote

0
  • No products in the cart.
0
  • No products in the cart.

Tech cube decking at private client

The Magnet system works over 6 essential elements :
1 : A T groove at the bottom of each board to allocate magnet clips .
2. Aluminium Joists with a very specific and accurate geometry for the magnet clips to click inside .
3.Spacers between boards to leave 4mm invisible expansion and drainage gap .
4. Blocking unite to keep all boards always in same place and prevent longitudinal movement .
5. Pedestals and Wedges levelling instruments .
6. The magnet clip – The corner stone of the system . Low friction coefficient and high abrasion resistance . Withstands – 40 degrees – 90 degrees .

Year

2019

Products Featured

Composite Decking
Date

25th September 2019